The projects

    Guides
    to housing work crews.

    Get a quoteReply within 30 minutes

    Where will your crew stay? I'll help you.
    Where
    Start typing and pick an address from the list.
    Move-in

    Reply within 30 minutes

    B4.9· 493 reviews· 500+ companies
    How it works
    B4.9· 493 reviews· 500+ companies

    Our homes are also listed on

    Booking.comAirbnbGoogle Vacation RentalsVrbotrivago
    How it works

    Three steps. A reply within 30 minutes.

    Which city?
    Gothenburg · Volvo Torslanda
    Mon 9 Nov
    12 people
    Get an offer →
    1

    Request

    Tell us where in Europe the job is, dates and team size. Two minutes, no account, no calls.

    2 min
    17homes matched
    2

    We match

    We match your needs with our homes and reply within 30 minutes.

    Reply within 30 min
    Move in today
    Whole house · 10 bedsApproved
    3

    We offer housing

    Ready-to-book homes with beds, parking and price per person. Approve — move in.

    Stays from 1 month
    Short answer

    Practical guides for anyone arranging housing for a work crew in Sweden: rules for foreign employers, choosing between a hotel and a furnished house, a checklist and what to know about Norrland.

    Updated 2026-11-24

    Guides

    The projects

    • BodenStegra (formerly H2 Green Steel)

      Stegra is building a steel plant in Boden that will turn iron ore into sponge iron without fossil fuels. Crews usually stay in Boden or Luleå. We arrange furnished houses and apartments for 4–200 people and reply within 30 minutes in the daytime.

    • GällivareLKAB in Gällivare and Kiruna

      LKAB is building a new sorting plant at Vitåfors in Gällivare, and Kiruna is in the middle of its urban transformation. Crews stay in Gällivare, Malmberget or Kiruna. We arrange furnished homes and reply within 30 minutes in the daytime.

    • LuleåSSAB’s new steel mill in Luleå

      SSAB is building a new steel mill with electric arc furnaces in Luleå and plans to start operations at the end of 2029. Crews usually stay in Luleå or Boden. We arrange furnished houses and apartments and reply within 30 minutes in the daytime.

    • SkellefteåThe Norrbotnia Line (Norrbotniabanan)

      The Norrbotnia Line is a new coastal railway between Umeå and Luleå, about 270 km long. The section between Dåva and Skellefteå is being built now. We arrange housing for crews in Umeå, Skellefteå, Piteå and Luleå and reply within 30 minutes in the daytime.

    • SkellefteåSkellefteå: Lyten and other projects

      Lyten has taken over the battery plant that used to be Northvolt Ett in Skellefteå and is restarting production line by line. The Norrbotnia Line is being built at the same time. We arrange housing for crews in Skellefteå and reply within 30 minutes in the daytime.

    • OskarshamnThe OKG outage in Oskarshamn

      During the outage of Oskarshamn 3, about 1,000 contractors come to OKG. Crews stay in Oskarshamn, Figeholm, Påskallavik or Kalmar. We arrange furnished homes for the whole outage and reply within 30 minutes in the daytime.

    • VarbergRinghals in Varberg

      Ringhals has two reactors in operation, Ringhals 3 and 4, and each year they are shut down for service and maintenance. Crews stay in Varberg, Väröbacka or Tvååker. We arrange furnished homes and reply within 30 minutes in the daytime.

    • ÖsthammarForsmark in Östhammar

      Forsmark has three reactors and is one of the largest employers in Östhammar municipality. SKB is also building the final repository for spent nuclear fuel there. We arrange housing for crews in Östhammar, Öregrund and Gimo and reply within 30 minutes in the daytime.

    • GöteborgVolvo Cars Torslanda

      Volvo Cars builds the electric EX60 in Torslanda after a major rebuild of the plant. Crews stay on Hisingen, in Torslanda or in Kungälv. We arrange furnished homes and reply within 30 minutes in the daytime.

    • GöteborgVästlänken (West Link)

      Västlänken is a railway in a tunnel under central Gothenburg with three new stations. Trafikverket expects traffic to start most likely in 2030. We arrange housing for crews in Gothenburg and reply within 30 minutes in the daytime.

    • NorrköpingOstlänken (East Link)

      Ostlänken is a new double track railway for high speed trains between Järna and Linköping, about 150 km. The preliminary construction period is 2024–2034. We arrange housing for crews in Norrköping, Linköping and Södertälje and reply within 30 minutes in the daytime.

    • StockholmE4 Stockholm Bypass (Förbifart Stockholm)

      The Stockholm Bypass is a new E4 west of Stockholm, 21 km long and mostly in tunnel. The whole road is expected to be finished around 2030. We arrange housing for crews in Stockholm and reply within 30 minutes in the daytime.

    • SverigeSvenska kraftnät

      Svenska kraftnät, the Swedish transmission system operator, builds new lines and substations to connect new power generation and strengthen the grid. Several large builds are under way in Norrbotten. We arrange housing for crews where the lines are built and reply within 30 minutes in the daytime.

    Book direct

    Available homes across Europe, book direct.

    Whole houses for crews in Europe, real homes, ready to book in the app.

    Reviews

    4.9 average across Google, Airbnb and Booking.com

    4.9
    493 reviews
    Checked homesOne invoicePersonal contactFree of charge

    Ready? Where in Europe is the job?

    Where
    Start typing and pick an address from the list.
    Move-in

    Reply within 30 minutes

    4.9· 493 reviews