Projects and employers in Gällivare
The worksites and projects in Gällivare (Norrbotten) below are places where contractors and hired crews often need housing for a period. Every fact has a source.
LKAB is building a new sorting plant at Vitåfors in Gällivare. According to International Mining in March 2026, NCC is doing the groundworks, foundations and concrete, starting in the second quarter of 2026 and finishing at the end of 2027. The plant is to be commissioned in 2028. The project needs groundworks and concrete crews over several seasons. (Source: International Mining, 2026-03-31)
- LKAB, nytt sorteringsverk Vitåfors is about 6 km by car from central Gällivare (Planned completion 2027). (Source: International Mining)
- Kraftledning Porjusberget–Malmberget is a project around Gällivare (Planned completion 2029). (Source: Svenska kraftnät (TT))
- From central Gällivare it is about 25 km by car to Boliden Aitik. (Source: Boliden)
Residential areas for crews around Gällivare
For crews in Gällivare we mainly search in Malmberget, Koskullskulle, Hakkas, Nattavaara and Porjus. There you find houses with several bedrooms, a kitchen and parking, and the trip to the worksites stays short.
The urban transformation in Malmberget continues, and according to LKAB about 3,200 people are affected until 2032. Gällivare is therefore growing with new schools and homes. We look for housing in the town itself and in Koskullskulle, and take distance, parking and the winter conditions of cold and darkness into account. (Source: LKAB, 2026-11-24)
Large crews in Gällivare often live at several addresses close to each other, with one contact person for all. A smaller group without a car manages well in an apartment near Länstrafiken i Norrbotten lines, and for a whole crew under one roof we pick a house with several bedrooms.
How the crew travels in Gällivare
- E10 and E45 are the main roads through Gällivare.
- Passenger trains stop at Gällivare station.
- The nearest airport with scheduled flights is Gällivare Lapland Airport.
- Local public transport is run by Länstrafiken i Norrbotten.
- If the crew drives its own vans to LKAB, nytt sorteringsverk Vitåfors, the home needs parking, and that is the first thing we check.
Svenska kraftnät plans two 400 kV lines to LKAB’s industrial area in Malmberget: from Porjusberget between 2026 and 2029 and from Messaure between 2028 and 2032. Line crews work out in the terrain and need housing with room for vehicles and equipment. Porjus and Nattavaara can be good bases for work along the lines, with the E45 and E10 as main roads. (Source: SVT Nyheter Norrbotten, 2026-03-02)
Gällivare has trains on the Iron Ore Line to Kiruna and Luleå and flights via Gällivare Lapland Airport. Crews rotating home every other week can therefore travel without a car. For crews with their own vehicles we suggest housing with engine heaters and a garage, because the winters are long and cold. (Source: LKAB, 2026-11-24)
Needs by sector in Gällivare
- Mining, for example LKAB, nytt sorteringsverk Vitåfors
- Mining crews often stay a long time. A house of their own with room for clothes, tools and vehicles works better than moving between short stays.
- Energy and power grid, for example Kraftledning Porjusberget–Malmberget
- The power sector often works in intense periods. We look for homes that fit the whole shift team and where the night shift can sleep undisturbed.
How do you arrange housing for foreign workers in Sweden?
Workers Stay helps companies from all over Europe that send crews to Sweden. The site and the form are available in 25 languages. You send a request with town, dates and number of people, get suggested furnished houses and apartments in Gällivare, and pay with one invoice per month to the company. Bed linen, a washing machine, wifi and parking are included, so the crew can move in straight away.








Kiruna
Boden